| Sr No |
|
Life Cycle Phase |
|
Purpose |
|
Deliverables |
|
|
|
|
| 1 |
Project Bidding |
Based on presales data quotation of project with technical methodology |
Techno-commercial Proposal |
|
|
|
|
| 2 |
Initial Project Plan |
Define project activities based on understanding of project after work allotment. |
Project Plan |
|
|
|
|
| 3 |
Requirement Analysis |
Gather, tighten, refine and document requirement specifications from user |
SRS Document |
|
|
|
|
| 4 |
High Level design |
Translate requirements specifications into logical design [Use Cases and Databases] |
Use Cases Document and Database Design document |
|
|
|
|
| 5 |
Low Level design |
Prepare detailed design specification And program specification, which are going tohelp to developers and QA team. |
Program specification document
Test case Documents |
|
|
|
|
| 6 |
Rapid Prototype |
Construct a skeletal (prototype) Portal adhering to the system design. |
Beta prototype of portal |
|
|
|
|
| 7 |
Application designing and development |
Based on program specifications and prototype approval system designing and actual coding |
Different release of system |
|
|
|
|
| 8 |
Implementation with documentation |
Implementation planning and set up preparation as per requirements. |
* Final SRS document
* Specification document
* Installation plan
* User manual
* Operation manual
* Production system
* Technical manual
* Training manuals
|
|
|
|
|
| 9 |
User acceptance |
Conducting user acceptance tests and getting approval on the same from end users. |
* Training Materials
* User Acceptance Test
* Plan
* User Acceptance Report
|
|
|
|
|
| 10 |
Support |
Provide maintenance support to user |
Maintenance plan |